Coyle Personnel
Logistics Project Scheduler
Job Location
Goole, United Kingdom
Job Description
Logistics Project Scheduler
Overall responsibility
Responsible for the creation and ongoing updating of detailed production schedules for an assembly line based on project requirements. Controls and monitors production to ensure a smooth throughput of the production orders, taking into account the optimum use of the resources.
Tasks
Creation of production schedules based on the overall project schedule
Controls the production sequences, in order to reach an optimum use of the resources with effective resource planning
Track progress of production orders
Implementation of measurement criteria and control
Records or monitors workflow (completion reports), in order to map the current production status
Target/actual comparison of the dates based on the actual reports
Detection of schedule deviations
Development of schedule control measures
Works on coordinating material movements between production units, to ensure an optimum production run.
Interfaces
Assembly management
Project planner
Project management
Quality
Logistics
Competencies
Extensive experience of assembly line scheduling
Experience of resource planning
Competent in all Microsoft tools, SAP, MS Project and Primavera competence
Location: Goole, GB
Posted Date: 11/24/2024
Overall responsibility
Responsible for the creation and ongoing updating of detailed production schedules for an assembly line based on project requirements. Controls and monitors production to ensure a smooth throughput of the production orders, taking into account the optimum use of the resources.
Tasks
Creation of production schedules based on the overall project schedule
Controls the production sequences, in order to reach an optimum use of the resources with effective resource planning
Track progress of production orders
Implementation of measurement criteria and control
Records or monitors workflow (completion reports), in order to map the current production status
Target/actual comparison of the dates based on the actual reports
Detection of schedule deviations
Development of schedule control measures
Works on coordinating material movements between production units, to ensure an optimum production run.
Interfaces
Assembly management
Project planner
Project management
Quality
Logistics
Competencies
Extensive experience of assembly line scheduling
Experience of resource planning
Competent in all Microsoft tools, SAP, MS Project and Primavera competence
Location: Goole, GB
Posted Date: 11/24/2024
Contact Information
Contact | Human Resources Coyle Personnel |
---|